"Infoksvodokanal" carries out large-scale replacement of worn and emergency networks. Today, the company is completing work on one of the main waterworks that provides drinking water to the residents of Moldavanka.
About 600 meters of new polyethylene pipe with a diameter of 500 mm has been laid here, the service life of which will be at least 50 years. During the laying of pipes, new wells were installed, cameras were switched on and fire hydrants were switched on.
In order to put the new line into operation, the employees of the water company will install modern shut-off valves of Austrian production and switch the newly laid water pipe into the existing water supply system.
In order to carry out the above works from 23:00 on October 20 to 09:00 on October 21, the "Main" and "Yuzhnaya" pumping stations will be stopped, as a result of which the water supply to consumers in the following districts of the city of Odessa and its suburbs will be stopped: Primorsky, Malynovsky, Kievsky, settlement Chervonyi Khutor, "Raduzhny" w/m, "Sauvignon 1-5" w/m, Tairovo residential complex.
The outage will not affect — Sedmoe Nebo J/M, Zastava, Lenposelok and Slobodka.