Schemes

Part of a popular square is being built in the center of Odessa

A number of inconsistencies were found in the construction documents.

In Odessa, they are trying to build part of the park, he writes TG channel EvroRegion Info.

A construction fence appeared on the territory of Starobazarny Square, around an abandoned toilet. Judging by the announcement on the fence, preparatory work is being carried out inside the fenced area for the subsequent construction of a children's cultural and sports center with the organization of public space.

The construction customer is Sport and Odych LLC (EGRPOU code 35991040), the co-founders of which are:
 Vasyl Ieremiya, deputy of the Odessa City Council from the "Trust in business" party, his mother, Anna Onyshchuk, who simultaneously manages Sport and Recreation LLC, and his father-in-law, Vyacheslav Shabroi.

LLC "Sport and Recreation" bought a toilet in the park, and then leased 0.037 ha for its own use (cadastral number 5110137500:26:011:0006). During the inventory of the park lands, this plot was excluded from the green zone, thanks to which the current construction became possible.

Journalists checked whether LLC "Sport and recreation" has a permit to carry out work. Indeed, 3 years ago, on August 29, 2018, the city GASK registered a notice of the start of construction works OD061182412345. The basis was urban planning conditions, which were amended by the Department of Architecture and Urban Planning on August 17.08.2018, 2017. Initially, in 2, a project for a 724-story house with a total area of ​​2018 square meters was approved, and in August 3, the height was increased to 904,25 floors and the total area increased to XNUMX square meters.

However, after reviewing the documents, a number of inconsistencies emerged:

  • the notification of the start of construction work was issued completely under the second project of the building, which has a total area of ​​718,5 square meters. As a result, the notification of the start of construction works becomes a dubious document, since it was issued for a project that has passed the examination, and not the one that is going to be implemented.
  • in the construction notification, a completely different contractor is indicated: now instead of the state-of-the-art "Vesttechstroy" the general contractor will be the state-of-the-art "Architectural group "Kvartal" (code EGRPOU 35117360). Also, the person in charge of maintenance has changed.
  • the building code "1263.5" is specified in the notification of the start of construction work. Buildings of preschool and after-school educational institutions". However, according to the cadastral map, the purpose of the fenced plot of land is for the construction of a utility establishment. Land developers recommend using clause 11 of Addendum A DBN V.2.2-9:2009 to understand what can be built on such land: "houses, buildings and communal facilities - institutions for civil rites, funeral bureaus, crematoriums; housing and operating establishments; public toilets; multifunctional buildings and complexes, including premises of various purposes".

The Department of Architecture, issuing city-planning conditions, does not pay attention to this discrepancy, referring to the General Plan and zoning, which refers to the entire Starobazarny Square, including the construction site, to zone P3 — recreational zones of greened areas for public use. For example, in zone P3, Odessa zoning (in contrast to state norms DBN B.1.1-22:2017) allows the construction of administrative buildings. But the administrative building and any entertainment infrastructure is not an educational institution.
It turns out that Jeremiah's company announces its intention to build a children's center on the site of the toilet, but does not change the purpose of the site.

In addition to obvious inconsistencies in the documents, construction in Starobazarny Square:
 did not receive approval from the Ministry of Culture, although the square is a constituent part of the landscape of the historical core of the Central Historical Area

did not receive permission to install a construction fence, as evidenced by the urban planning monitoring map.

I wonder if the city GASK will include this object in the plan of its inspections?

Comments

Recent ones

The most relevant news and analytical materials, exclusive interviews with the elite of Ukraine and the world, analysis of political, economic and social processes in the country and abroad.

We are on the map

Contact Us

01011, Kyiv, str. Rybalska, 2

Phone: +38-093-928-22-37

Copyright © 2020. ELITEXPERT GROUP

To Top