Telegram
Kyiv

Light, heat and water in Kyiv: the current situation after shelling and frost

The restoration of power supply to residents in Kyiv and the region is underway. Residents of the capital, who were left without heat as a result of Russian shelling, are gradually having their homes heated. About this said Prime Minister Yulia Svyridenko.

According to her, after the Russian shelling, the heating system in Kyiv was launched. Heat-generating facilities supply heat to residential buildings, and a phased launch of supply directly to homes is underway.

She noted that the situation with electricity is more complicated. The right bank of Kyiv has almost completely been switched to planned outage schedules. Emergency outages remain on the left bank.

"The power grids are significantly damaged, and due to low temperatures, people are using electric heaters more actively. We ask you to consume electricity sparingly while the power system is being restored after the shelling," — Svyridenko noted.

Emergency shutdowns

On the DTEK page at Telegram This afternoon, they announced the use of emergency power outages, clarifying that the light schedules are not in effect. Also on the official page of the Kyiv City State Administration appointed, what In Kyiv, the water and heating systems were stopped.

A little later, the Ministry of Energy reported, which is in Kyiv and the Kyiv region managed to stabilize the electricity supply situation.

"Emergency outages continue to operate in the left-bank districts of Kyiv region, in particular Boryspil and Brovarsky. The remaining districts are gradually returning to outage schedules," — the message says.

В official notification Ukrenergo noted that consumers in Kyiv, Kyiv, Zhytomyr, and Poltava regions are returning to hourly power outages according to schedules.

Emergency power outages continue in the Holosiivskyi and Pecherskyi districts of Kyiv and on the left bank of the capital, according to the message DTEK

Electric transport

KP "Kyivpastrans" informed, that due to the unstable situation in the power system, electric transport on the left and right banks of the capital was temporarily stopped. Duplicated bus routes have been launched in the city.

In particular, to duplicate the Borshchagovskogo high-speed tram, bus route No. 3-T “Starovokzalna Street - Ring Road” was organized.

Comments

Recent ones

The most relevant news and analytical materials, exclusive interviews with the elite of Ukraine and the world, analysis of political, economic and social processes in the country and abroad.

We are on the map

Contact Us

01011, Kyiv, str. Rybalska, 2

Phone: +38-093-928-22-37

Copyright © 2020. ELITEXPERT GROUP

To Top